Public Services

Public Services Current Projects

Public Services Current Projects

 

PROJECT STATUS REPORT

STREET PROJECTS
Curtis Avenue Street Improvement Project

Project Description:  This project consists of a total replacement of the street.  The City will remove the existing street and pour it back with new concrete

Current Status:  JPS Construction was awarded this project and is currently working on the last concrete pour for the street.  Restoration of the site is all that remains. This Project is 99% Complete.

 

Yealey Drive Street Improvement Project

Project Description:  This project consists of a mill of the existing asphalt and overlay with new asphalt.

Current Status:  All that remains is restoration and edge sealing. This Project is 95% Complete.

 

Government Center Parking Lot and Bike Path Improvement Project

Project Description:  This project consists of a mill of the existing asphalt and overlay with new asphalt with new stripping.  There is some storm water under drain work that will take place in the parking lot and near a few sections of the bike path.

Current Status:  Eaton Asphalt Company was awarded this project, the concrete replacement has been completed along with the storm and drainage work.  Since the temperatures have turned colder we put this project on hole till spring.  The remaining parking lot will be completed in the spring as soon as temperature allow.  This Project is 40% Complete.

 

WATER MAIN PROJECTS

Woodland Water Main Project

Project Description: This consists of the installation of a new 8” water main that will provide better service and a higher quality of water to our residents in this area.

Current Status:  This project is currently in the punch list stage. This Project is 99% Complete.

 

Grand Avenue Water Main Project

Project Description: This consists of the installation of a new 8” water main that will provide better service and a higher quality of water to our residents in this area.

Current Status:  The water main portion of this project is complete.  Crews just finished the last of the concrete pours on this street and the project is currently in the punch list stage. This Project is 99% Complete.

 

Mary’s Court Water Main Project

Project Description: This consists of the installation of a new 8” water main that will provide better service and a higher quality of water to our residents in this area.

Current Status:  This project has been pushed until spring. This Project is 0% Complete.

 

SEWER MAIN PROJECTS

Aero Parkway Pump Station

Project Description: The City has opted to construct another pump station to intercept current and future flow before it gets to Greenview Pump Station. This project will consist of building an interceptor lift-station behind Wal-Mart that will service the new development on Ted Bushelman.

Current Status:  The contractor is working on final grading.  Waiting on Duke Energy to energize the station.  This Project is currently 98% Complete.

 

Aero Parkway Force Main

Project Description:  With the construction of the new Aero Parkway Pump Station a new force main will be installed to move the sanitary sewer flow from the pump station up hill to where it will go by gravity which is near the intersection of Houston Road and Turfway Road.

Current Status: The contractor has laid HDPE pipe up from the pump station towards the new Logistics One building and down Ted Bushelman, down Houston Road to Famous Dave’s.  The new force main has been test out and is ready to be put into service.  Final restorations is all that remains. This Project is currently 98% complete.

 

 PARK / FACILITIES PROJECTS

Florence Community Plaza

Project Description:  This project consists of constructing a memorial park to recognize the Departments of the City of Florence. This park will be constructed on the vacant property on Mall Road near Snuggys.

Current Status:  This project is in the punch list stage.  This Project is 99% Complete.

 

Crossroads Point Plaza

Project Description: This project is located on the corner of Main Street and Dixie Hwy.  This is the clock tower property.  The City will be installing a backdrop behind the clock tower and has a full landscaping plan that will tie everything together.

Current Status: An existing fuel tank has been exposed and brought the project to a screeching halt.  After a long few months the fuel tank has been removed.  Soil samples have been taken to determine if the tank location need to be over excavated due to the contaminated soils. This Project is 15% Complete.

 

Rosetta Facility Improvement Project

Project Description: This is a facility improvement project that will consist of building a training facility, fire burn tower and remodel of existing buildings.

Current Status: Mass Grading is wrapping up; all sanitary storage tanks have been fully removed.  Crews are currently working on installing water and sewer pipe for the site. Footers and concrete slabs are complete for the storage bins and training facility.  Demolition has begun in the existing water building. This Project is 55% Complete.

 

Nature Park Gathering House Improvement Project

Project Description: This is a facility improvement project that will consist of remodeling the existing gathering house and making site improvements to the property.

Current Status: Bids came in on December 21st and we currently are in the process of awarding this project to the low bidder.  This Project is 0% Complete.